This week we gave a presentation on our current progress. This month we will be finalizing our design and analysis for the suspension. A link to our second presentation is below:
Subscribe to:
Post Comments (Atom)
-
This week we had a general meeting with all of ME195 to discuss the next paper that is due. Afterwards, I was able to develop the test fra...
-
This week, I was able to write the Arduino code for the suspension assembly, which utilizes the PID() function from Arduino. The Kp, Ki, and...
-
This week, we prepared a Lightning Talk to present to the Spartan Superway team our project description, specifications, and end goals. Salv...
No comments:
Post a Comment